AppendixA: Electrical Wiringfor 265 Volt Models
NOTE: It is recommended that the PXSB subbase assembly, the PXCJ conduit kit and the PXDS disconnect switch be installed on all
hardwired units. If installing a flush-floor mounted unit, make provisions for all the line voltage power leads and conduit to be removed
for ease of maintenance and service to the chassis.
To install the line voltage power leads and conduit to the chassis, follow the instructions below.
1. Remove the four control box retaining screws (A) and open
the control box.
2. Pull the chassis power lead wires (B) (located on the bottom-
right side of the control box) through the plastic bushing so
they are located inside the control box.
3. Remove the plastic bushing.
4. Route the line voltage power leads through the hole where
the plastic bushingwas located, and secure its conduit (use
a 1!2" straight conduit connector, with the Iocknut on the
inside of the control box.)
5. Make the appropriate electrical connections within the
control box, then secure the box on the chassis. Detailed
instructions are included with the installation instructions
for the conduit kit (PXCJ).
6. Route the line voltage power conduit from the control
box straight down the right front to the bottom side of the
chassis. This will allow thefront cover to be installed without
interference with the electrical conduit.
Figure15
LineVoltageConnections
Screws
Fuse holder
Screws
Inside back of control
panel cover.