Download Print this page

Starting Instructions; Operating Tips - Craftsman 358.797110 Operator's Manual

Gutter attachment kit

Advertisement

KNOW YOUR GUTTER
ATTACHMENT
READ THIS OPERATOR'S MANUAL AND SAFETY RULES BEFORE OPERATING YOUR
UNIT. Compare
illustrations
to your unit to familiarize
yourself
with the location of
the various controls
and adjustments.
Save this manual for future reference.
/_
_
Collar for
Nozz_/_/
U
Gas Units
o00,e n"s'
°ns--- Tu e
............
_
Adapter for
_l
Adapter for
Gas Units
_
Electric Units
with Tube
Pivot Tube
Decal
Release Button
Elbow with Spacer Ring
_
STARTING INSTRUCTIONS
_WARNING:
You MUST make sure
the tubes are secure before using the
unit. Do not use the unit without all of
the tubes properly attached to avoid fly-
ing debris and/or impeller contact which
can cause serious injury. Always wear
eye protection to prevent rocks or debris
from being blown or ricocheting into the
eyes and face which can result in blind-
ness or serious injury.
,_WARNING:
Hold the unit as illus-
trated when starting (for gas units
only).
Do not set unit on any surface
except a clean, hard area when start-
ing and/or using the unit. Debris such
as gravel, sand, dust, grass, etc could
be picked up by the air intake and
thrown out through the discharge
opening,
damaging the unit or proper-
ty, or causing serious
injury to bystand-
ers or the operator.
NOTE: When starting unit, lean the top of
gutter attachment against a wall, tree, etc.,
for support.
STARTING
POSITION
(for gas
units only)
• Support
the gutter
attachment
with
one hand as soon as the engine or
motor starts.
SUPPORT
___y,
THE TUBES
OPERATING
TIPS
• Wear eye protection to guard against
eye injury.
• To reduce the risk of hearing loss as-
sociated
with sound level(s),
hearing
protection is required.
• To reduce the risk of injury associated
with contacting
rotating parts, stop the
engine/disconnect
from
the
power
source
and wait
until impeller
has
completely
stopped
turning
before
installing or removing attachments.
• Stand 3 to 4 feet away from building.
• Rotate the pivot tube to position
the
nozzle right or left.
• Follow the STARTING INSTRUCTIONS
in your operator's
manual.
-6-

Advertisement

loading