Epson 610 Service Manual page 37

Seiko epson corporation. user guide color image scanner 610
Hide thumbs Also See for 610:
Table of Contents

Advertisement

EPSON Perfection 610
9. Follow the steps below to remove the Timing Belt from the CR Motor
Unit.
1) Remove the E-ring.
2) Remove the transmission gear.
3) Disengage the timing belt from the drive pulley.
Assembly and Disassembly
Timing Belt
Disassembly Procedures
Timing Belt
Transmission Gear
Figure 4-24. Timing Belt Removal
E-ring
Figure 4-25. Parts in the CR Motor Unit
Revision B
E-ring
Drive Pulley
Transmission Gear
37

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Perfection 610

Table of Contents