Conveyor Belt Assembling And Disassembling - Vulcan-Hart VEC3018 ML-126198 Installation & Operation Manual

Vec series electric conveyor ovens
Table of Contents

Advertisement

CONVEYOR BELT ASSEMBLING AND DISASSEMBLING (Fig. 8)
Install the conveyor belt so that it always runs in the
direction indicated by this arrow — the closed end of
the loop toward the direction of travel.
The arrows in the belt illustrate the movement of the
splicing strand between steps.
When bending the splicing strand, try to limit bending
to straight portions of the strand rather than in the "Z"
bend area.
Splice one side completely before starting the other
side.
After completely splicing the belt, it is advisable to go
along the width of the belt straightening the spliced-
in strand.
Depending upon the width of the belt, there might be
one, two, or three splicing strands.
1
2
3
4
5
6
7
— 13 —
PL-52997
Fig. 8

Advertisement

Table of Contents
loading

Table of Contents