HP D2D Manual page 30

D2d nas integration with hp data protector 6.11 (eh985-90933, march 2011)
Hide thumbs Also See for D2D:
Table of Contents

Advertisement

9.
After creating all of the schedule entries, proceed to the Summary page and select Save As
... from the finishing steps page.
The backups will now run according to the new schedule and, for initial backups, new backup
files will be created.
When backup protection expires, e.g. after 1 week of incremental backups, the previous
backup files will be overwritten. Overwriting of the backup files will result in housekeeping
work being generated; this will run in parallel with the backup process and could cause a
slight reduction in performance.
During the backup Data Protector creates two files; one is the backup data file depot which
grows throughout the backup, the other is a temporary file of 15 MB which is removed when
the backup completes.
30
Configure a backup rotation scheme

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Data protector 6.11

Table of Contents