Assembly Of The Top Clamping Bar To The Dovetail Base - Sears Craftsman 171.25450 Owner's Manual

Industrial dovetail fixture
Table of Contents

Advertisement

ASSEMBLY OF THETOP CLAMPING BARTO THEDOVETAIL BASE
1) Assemble o ne of the boltsupportsto bothof the 5/16-18X 3-1/2"longroundhead squareneck boltsas shown in Figure 2.
2) Alignthe square on the boltwiththe squareholein the boltsupport.Theboltsupportisto =bottom-out"againstthe bolt asshown in
Figure 3.
FIG. 2
5/16-18X3-1/2" FIG. 3
long ROUND
HEAD SQUARE
_-x
,o,,
FIG. 3a
3) Assemble one ofthespringsto eachof thenylonspring retainers by pushingthespringoverthe raisedcylindricalportionof the
springretaineras shownin Figure 3a andFigure3b,
4) Positionthe dovetailbaseon a fiat smoothsurfaceso the backof the baserestson thesurface.
NOTE: ALTHOUGH B OTH ENDS OFTHEDOVETAIL BASE ARESHOWN ASSEMBLED IN THEFOLLOWING FIGURES, THEACTUAL A SSEM-
BLY IS DONE ONEEND ATATIME.
5) Fromthe bottomof the base,inserta boltwithbolt supportthroughtheslot in the top of the basesothe raisedportionof the bolt
supportgoesinto theslot, asshownin Figure4,
Fig, 4
SLOT IN
SLOT IN
DOVETAIL
DOVETAIL
EASE
DOVETAIL
BOLTAND B OLT
EASE
/
BASE
BOLTAND
BOLT SUPPORT
FRONT OFDOVETAIL BASE
6) Placea 5/16" I.D.X 7/8"O.D.thick nylonwasher overthe boltso that thecountersink facesawayfromthe dovetailbaseas shownin
Figure6. It will be necessary f or youto holdthe bolt in placewhenperforming this andthe followingsteps.
HELPFUL H INTS:Position the bolt andthe boltsupport underthe notchin the rib as shownin Figure5, to help hold thebolt in place,
Fig. 5
_
NOTCH I NRIB
SLOTIN DOVETAIL B ASE
BOLTAND B OLT SUPPORT

Advertisement

Table of Contents
loading

Table of Contents