2. Installation
Inspecting Your Shipment
Open the shipping carton of the Switch and carefully unpack
its contents. The carton should contain the following items:
•
One VH-8G-L3 8-port Gigabit Ethernet Layer 3
Switch.
•
Mounting kit: 2 mounting brackets and screws.
•
Four rubber feet with adhesive backing.
•
One AC power cord.
•
One ESD wrist strap.
•
Product Documentation.
If any item is found missing or damaged, please contact your
local Enterasys sales agent for replacement.
Installation
Use the following guidelines when choosing a place to install
the Switch:
•
The surface must support at least 3 kg.
•
The power outlet should be within 1.82 meters (6
feet) of the device.
•
Visually inspect the power cord and see that it is
secured to the AC power connector.
•
Make sure that there is proper heat dissipation from
and adequate ventilation around the Switch. Do not
place heavy objects on the Switch.
9033705-01
20