Download Print this page

COZY BBT54 Installation And Operation Instructions Manual page 19

Direct vent gas baseboard heater

Advertisement

VENT WEATHER
SEAL KIT - VWSK5/10
NOTE: This kit has been designed and certified for use with a Cozy gas baseboard heater only. Use only factory
supplied kit and components. See Figure 1 for parts list of Vent Weather Seal Kit.
STEP
1.
Change the location for the vent by following
Figure 1 in the installation
and operating
instructions
provided
with the Cozy gas baseboard
heater.
STEP
2.
Drill a three (3) inch diameter hole through the wall of the chosen location.
STEP
3.
Measure
the wall thickness.
STEP
4.
Using a two (2) inch tube cutter, cut the PVC wall sleeve seven-eights
(7/8") inch longer
than the
measured
wall thickness.
See Figure 2.
STEP
5.
Clean the PVC sleeve and apply PVC cement (provided)
on opposite
sides of sleeve.
Place straps
on cement leaving eight (8) inches past sleeve end. Wait ten (10) minutes
for cement to dry before
proceeding
to Step 6. See Figure 2.
STEP
6.
Apply petroleum jelly or an equivalent
lubricant to the outside of the weather seal. The lubricant will
make it easier to push the weather
seal through the wall. See Figure 2.
STEP
7.
From inside, hold the wall sleeve with the PVC straps lined up horizontally.
Push the PVC pipe and
weather seal slowly through the wall until the weather seal is completely
outside the wall. See Figure
3.
STEP
8.
Pull the PVC straps toward you to pull the weather
seal firmly against the outside wall. See Figure
3.
STEP
9.
Being careful to keep the PVC straps lined up horizontally
and pulled tight to maintain
the outside
seal, bend the straps away from sleeve and secure to wall. Depending
on type of wall, anchors (not
provided)
may be required.
See Figure 4.
STEP
10.
First, put blue pipe plug in PVC pipe to prevent insulation
from getting inside!
Insert nozzle from a
tube of foam insulation
between
the wall and the wall sleeve.
Starting
at the weather
seal, slowly
inject the foam, working towards the inside wall. CAUTION:
Read the manufacturers
instructions
on the can of foam for special instructions
and warnings.
STEP
11.
Wait fifteen (15) minutes for foam to dry, cut away any excess from around sleeve on inside wall. If
Cozy gas baseboard
heater will be installed
at a later date, leave the pipe plug in the wall sleeve to
seal the vent hole.
STEP
12.
Install the Cozy gas baseboard
heater per the installation
instructions
provided
with heater.
STEP
13.
Slide the O-ring over the air intake tube to a position approximately
two (2") inches from the end of
the tube.
See Figure 5.
STEP
14.
Remove pipe plug from wall sleeve.
STEP
15.
Apply petroleum
jelly or equivalent
lubricant around the outside of the O-ring.
Insert the air intake
tube through the PVC wall sleeve until back of heater is against the wall.
Secure heater to wall.
Page 19
CONT'D. --- ILLUSTRATIONS - NEXT PAGE

Advertisement

loading

This manual is also suitable for:

Bbt103Bbt104Bbt53