Thermostat Inputs; Complete C Control - Carrier AQUAZONE 50RHC Operating And Troubleshooting

Solid-state heat pump controls
Hide thumbs Also See for AQUAZONE 50RHC:
Table of Contents

Advertisement

HEATING
STAGE 1 MODE
--hi
Heating Stage 1 mode, the
fan enable and compressor
relays are turned on immediately.
Once the demand is removed,
the relays are turned off and the
control reverts to Standby
mode. If there is a master/slave
or
dual compressor
application,
all compressor
relays and related
functions will operate per their associated
DIP switch 2 setting
on S 1.
HEATING
STAGE 2 MODE
-- In Heating Stage 2 mode, the
Fan Enable and Compressor
relays lemain on. The fan speed
relay is turned on immediately
and is turned off immediately
once the demand
is removed.
The control reverts to Heating
Stage 1 mode. If thele is a master/slave
or dual compressor
application,
all compressor
relays and related functions
will
operate per their associated
DIP switch 2 setting on S 1. If con-
figured as Stage 2 (DIP switch SI position 2 is set to OFF)
then the compressor
and fan will not turn until there is a call
for Stage 2.
HEATING
STAGE 3 MODE
-- In Heating Stage 3 mode, the
fan enable, fan speed and compressor
relays will remain on.
The EHI
output
is turned
on immediately.
With continuing
Heat Stage 3 demmad, EH2 will turn on after 10 minutes. The
EHI and EH2 output signals _ue turned off immediately
when
the Heating Stage 3 demand is removed. The control reverts to
Heating Stage 2 mode.
The EH2 output
signal will be off if FPI
is gleater than
45 F AND FP2 (when shorted)
is greater thma 110 F during
Heating
Stage 3 mode. This condition
will have a 30-second
recognition
time. Also, during Heating
Stage 3 mode, EHI,
EH2, fan enable, mad fan speed will be ON if G input is not
active.
EMERGENCY
HEAT MODE --
In Emergency
Heat mode,
the fan enable mad fan speed rehtys _u'e turned on. The EHI
output is turned on immediately.
With continuing
Emergency
Heat demmad, EH2 will turn on after 5 minutes. Fan enable mad
fan speed relays are turned off after a 60-second
delay. The
control reverts to Standby mode.
The EHI,
EH2, fan enable, mad fan speed signals will be
ON if the G input is not active during Emergency
Heat mode.
COOLING
STAGE
1 --
In Cooling
Stage 1 mode, the fan
enable, compressor
and RV relays are turned on immediately.
If configured
as stage 2 (DIP switch SI position 2 set to OFF)
then the compressor
and fan will not tuna on until there is a
stage 2 demmad. The fan enable mad compressor
relays are
turned off immediately
when the Cooling Stage 1 demand
is
removed.
The control reverts to Standby mode. The RV relay
remains on until there is a heating demand. If there is a master/
slave or dual compressor
application,
all compressor
relays and
related functions will track with their associated
DIP switch 2
on S 1.
COOLING
STAGE 2 --
In Cooling
Stage 2 mode, the fan
enable, compressor
and RV lelays remain
on. The fan speed
relay is turned
off immediately
once the Cooling
Stage 2
demand
is removed.
The control reverts to Cooling
Stage 1
mode. If there is a master/slave
or dual compressor
application,
_fll compressor
relays mad related functions will track with their
associated
DIP switch 2 on S 1.
NIGHT LOW LIMIT (NLL) STAGED
HEATING
-- In NLL
staged
Heating
mode,
the override
(OVR)
input
becomes
active mad is recognized
as a call for heating
and the control
will immediately
go into a Heating
Stage 1 mode. With an
additional
30 minutes of NLL demmad, the control will go into
Heating Stage 2 mode. With another additional
30 minutes of
NLL demand, the control will go into Heating Stage 3 mode.
Thermostat
Inputs
COMPLETE
C CONTROL
Y and W Terminals
--
Terminals
Y and W have l-second
recognition
time when being activated or removed.
O and G Terminals
--
Terminals
O and G are direct pass
through signals monitored
by the microprocessol:
R and C Terminals
-- Terminals
R and C originate
from the
trausforlllel:
ALl and AL2 Terminals
--
Terminals
ALl
and AL2 origi-
nate from _darm relay.
Terminal
A -- Tenninal
A is pmalleled
with compressor
out-
put for use with well water solenoid valves.
Y 1/4 in. Quick Comaect -- The Y I/4 in. quick connect is for
factory use. It is used for panel mount relays such as loop pump
relay,
DELUXE
D CONTROL
(see Tables 8-10)
Y I --
Terminal YI
is input for compressor stage 1 if DIP
switch 3 on SI is set to ON. If DIP switch is set to OFF, then
YI is input for Cooling Stage 1.
Y2 --
Terminal
Y2 is input for compressor
stage 2 if DIP
switch 3 on SI is set to ON. If DIP switch is set to OFF. then
Y2 is input for Cooling Stage 1.
W I-
If terminals YI and Y2 abe active and DIP switch 3 on
S 1 is set to ON, then WI is input for Heating Stage 3. If YI and
Y2 me NOT active and DIP switch is set to ON, then WI is
input for Emergency
Heat mode. If DIP switch is set to OFT,
then WI is input for Heating Stage 1 mode.
O/W2 -- If DIP switches 3 and 4 on S 1 are set to ON, termimd
O/W2 will be input for Reversing
Valve (RV) relay. If DIP
switch 3 is OFT and DIP switch 4 is ON, O/W2 will be the
input for Heating Stage 2 mode.
If DIP switch 3 is ON and DIP switch 4 is OFE O/W2 will
be the input for Heat mode. In this mode, the thermostat
out-
puts a B call when in Heating
mode and does not have an
O output. The D control will employ RV control. This ensures
RV will only switch positions if the thermostat has a call for
heating/cooling
mode change.
R and C Terminals
-- Terminals
R and C originate
from the
trausfoHllel:
ALl and AL2 Terminals
--
Terminals
ALl
and AL2 origi-
nate from ;darln relay.
G -- Input for fan enable relay.
NSB and Override
--
When digital NSB is selected via the
accessory relay DIP switch and the NSB input is connected
to
ground C, the appropriate
accessory
relay directly
tracks the
NSB input.
When digital NSB is NOT selected via the accessory
relay
DIP switch and the NSB input is NOT connected
to ground C,
then all thermostat inputs me ignored. During this time period,
if OVR is momentarily
comaected to 24 vac, then the thermo-
stat outputs are once again monitored
for 2 hours. After the
2-hour override period, the Deluxe D control will assume NSB
is again connected
to ground C and the control will revert back
to ignoring the thermostat
inputs. There will be a random
start
timer when coming back from NSB mode.
A
maximum
of
75
Deluxe
D
controllers
can
be
daisy-chained
to the NSB terminals.
The maximum
total wire
resistance
is 500 ohms.
14

Advertisement

Table of Contents
loading

Table of Contents