Lenovo E100 Hardware Maintenance Manual page 102

Hardware maintenance manual
Hide thumbs Also See for E100:
Table of Contents

Advertisement

13. Holding the microprocessor with your fingers, position the microprocessor so
14. Lower the microprocessor straight down into the system board socket of the
15. Lower the microprocessor retainer.
16. Lock the retainer with the small handle to secure the microprocessor in the
17. The new retention bracket has plastic one-way rings on the posts that insert
18. Install the heat sink and fan assembly on the new system board.
19. Install the new system board into the chassis and align the screw holes with
20. Connect all the cables to the system board. See "Identifying parts on the
21. Go to "Completing the FRU replacement" on page 105.
96
Lenovo 3000 E100
that the notches on the microprocessor are aligned with the tabs in the
microprocessor socket on the new system board.
Important
To avoid damaging the microprocessor contacts, do not tilt the
microprocessor when installing it into the socket.
new system board.
socket.
into the rear of the new system board. Install the new retention bracket by
aligning the posts on the module with the holes in the system board and
pushing the posts through the holes until the retention bracket is secure.
those in the chassis. Insert and tighten the screws that secure the system
board.
system board" on page 85.

Advertisement

Table of Contents
loading

This manual is also suitable for:

3000 e100

Table of Contents