Frame 500 Removal - Epson EPL-N1600 Option Service Manual

500 sheets feeder
Hide thumbs Also See for EPL-N1600 Option:
Table of Contents

Advertisement

EPSON EPL-N1600/500 Sheets Feeder

4.1.4 Frame 500 Removal

1. Remove the Feeder Assembly 500.
2. Remove the four screws that are securing the Frame Subassembly
500 to the Frame 500.
3. Push up on the Actuator No Paper 500 and raise the Subassembly
off of the Frame 500.
4. Unhook the Solenoid Pick-Up wire harness from the harness clip.
5. Disconnect J322 on the Solenoid Pick-Up wire harness from the
PWB Assembly Size 500.
6. Remove the Frame Subassembly.
Rev. 0
Chapter 4
DISASSEMBLY AND ASSEMBLY
Figure 4-2. Frame 500 Removal
20

Advertisement

Table of Contents
loading

Table of Contents