Carrier 23XL Installation Instructions Manual page 17

50/60 hz hermetic screw liquid chillers
Table of Contents

Advertisement

NOTES:
1. Dimensions in ( ) are in millimeters.
2. Isolation package includes 4 shear flex pads.
NOTE: The accessory spring vibration isolation package is supplied
by Carrier for installation in the field.
Fig 17 — 23XL Accessory Spring Vibration Isolation (Shown With Accessory Soleplates)
VIEW B-B
Fig. 15 — Standard Isolation
HRS — Hot Rolled Steel
NOTES:
1. Dimensions in ( ) are in millimeters.
2. Accessory (Carrier supplied, field installed) soleplate package in-
cludes 4 soleplates, 16 jacking screws and leveling pads. Re-
quires accessory spring vibration isolation package.
3. Jacking screws to be removed after grout has set.
4. Thickness of grout will vary, depending on the amount necessary
to level chiller. Use only pre-mixed non-shrinking grout, Celcote
HT-648 or Master Builders 636, 0 -1
Fig. 16 — Accessory Isolation
17
1
(38.1) to 0 -2
1
(57) thick.
2
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents