Location; Hazardous Locations; Installation; Leveling Legs (If Desired) - Bryant 340MAV Installation, Start-Up, And Operating Instructions Manual

4-way multipoise fixed-capacity direct-vent condensing gas furnace series j
Table of Contents

Advertisement

III. HAZARDOUS LOCATIONS
Fig. 16—Installation in a Garage
WARNING: When furnace is installed in a residential
garage, it must be installed so that burners and ignition
sources are located a minimum of 18 in. above floor. The
furnace must be located or protected to avoid physical
damage by vehicles. When furnace is installed in a public
garage, airplane hangar, or other building having a
hazardous atmosphere, unit must be installed in accor-
dance with NFGC or NSCNGPIC. (See Fig. 16.)

INSTALLATION

I. LEVELING LEGS (IF DESIRED)
When furnace is used in upflow position with side inlet(s), leveling
legs may be desired. (See Fig. 17.) Install field-supplied,
corrosion-resistant 5/16-in. machine bolts and nuts.
5
16
5
3
1
4
5
16
3
1
4
3
1
4
Fig. 17—Leveling Legs
NOTE: The maximum length of bolt should not exceed 1-1/2 in.
1. Position furnace on its back. Locate and drill a 5/16-in.
diameter hole in each bottom corner of furnace. (See Fig.
12.) Holes in bottom closure panel may be used as guide
locations.
18-IN. MINIMUM
TO BURNERS
A93044
16
3
1
4
5
16
A89014
2. For each hole, install nut on bolt and then install bolt and
nut in hole. (Install flat washer if desired.)
3. Install another nut on other side of furnace base. (Install flat
washer if desired.)
4. Adjust outside nut to provide desired height, and tighten
inside nut to secure arrangement.
NOTE: Bottom closure must be used when leveling legs are used.
See Bottom Closure Panel section.
II. INSTALLATION IN UPFLOW OR DOWNFLOW
APPLICATIONS
NOTE: For downflow applications, this furnace is approved for
use on combustible flooring when special base (available from
manufacturer) Part No. KGASB0201ALL is used. Special base is
not required when this furnace is installed on manufacturer's Coil
Assembly Part No. CD5 or CK5, or Coil Box Part No. KCAKC is
used.
1. Determine application being installed from Table 1.
2. Construct hole in floor per dimensions specified in Table 1
and Fig. 18.
3. Construct plenum to dimensions specified in Table 1 and
Fig. 18.
4. If downflow subbase (KGASB) is used, install as shown in
Fig. 19.
If coil assembly CD5 or CK5 or Coil Box KCAKC is used,
install as shown in Fig. 20.
NOTE: Remove furnace perforated, discharge duct flanges when
they interfere with mating flanges on coil on downflow subbase.
To remove furnace perforated, discharge duct flange, use wide
duct pliers or duct flange tool to bend flange back and forth until
it breaks off. Be careful of sharp edges. (See Fig. 21.)
WARNING: Do not bend duct flanges inward as shown
in Fig. 21. This will affect airflow across heat exchangers
and may cause limit cycling or premature heat exchanger
failure. Remove duct flange completely or bend it inward
a minimum of 210° as shown in Fig. 21.
NOTE: For 140 size unit when installed in downflow orientation,
cut the white jumper wire off between terminals PL1-7 and PL1-9.
Do not cut white jumper between terminals PL1-7 and PLI-11.
Refer to Fig. 30 for location of jumper. Cut jumper close to
connector and remove wire to avoid a short circuit.
III. INSTALLATION IN HORIZONTAL APPLICATIONS
CAUTION: The entire length of furnace MUST be
supported when furnace is used in a horizontal position to
ensure proper draining. When suspended, bottom brace
supports sides and center blower shelf. When unit is
supported from the ground, blocks or pad should support
sides and center blower shelf area. Failure to follow this
caution will result in intermittent unit operation or per-
formance satisfaction.
These furnaces can be installed horizontally in either horizontal
left or right discharge position. In a crawlspace, furnace can either
be hung from floor joist or installed on suitable blocks or pad.
Furnace can be suspended from each corner by hanger bolts and
angle iron supports. (See Fig. 22.) Cut hanger bolts (4 each 3/8-in.
all-thread rod) to desired length. Use 1 X 3/8-in. flat washers,
3/8-in. lockwashers, and 3/8-in. nuts on hanger rods as shown in
Fig. 22. Dimples are provided for hole locations. (See Fig. 2.)
I. GENERAL REQUIREMENTS
The duct system should be designed and sized according to
accepted national standards such as those published by: Air
Conditioning Contractors Association (ACCA), Sheet Metal and
—14—

AIR DUCTS

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Series j

Table of Contents