Clearances & Cleaning - Potterton Performa 24 Eco HE User's Manual And Important Warranty Information

Condensing combination boiler
Table of Contents

Advertisement

5mm Min
450mm Min
For Servicing
Purposes
5mm Min
Fig. 4
In Operation
8
© Baxi Heating UK Ltd 2011
450mm
2
Reset
Burner On
1
3
Flame Failure
4
Power On
0
bar
5.0 Clearances & Cleaning
20mm/5mm Min
5.1
see *NOTE:
1. This appliance must have been installed in accordance
with the manufacturer's instructions and the regulations
in force.
200mm Min
2. Any modification that may interfere with the normal
operation of the appliance without express written
permission from the manufacturer or his agent could
invalidate the appliance warranty. In GB this could also
infringe the Gas Safety (Installation and Use) Regulations.
GB - Heating Industry definition meaning England, Scotland,
Wales, Northern Ireland, Isle of Man and the Channel Isles
3. Your boiler must not be operated without the casing
correctly fitted.
4. Do not interfere with any sealed components on this
780mm
boiler.
5. Take note of any warning labels on your boiler.
6. Your boiler should have the following minimum
clearances for Safety and Maintenance
(Fig. 34):-
Top
Bottom
Left side
Right Side
200mm Min
Front
* NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also sufficient
for routine maintenance. However a clearance of
20mm is required if it is necessary to remove the
secondary heat exchanger. This should be considered
when siting the appliance and in the event of any
subsequent alteration in the area of installation.
7. If your boiler is installed in a compartment, do not use
it for storage purposes. Do not obstruct any purpose
provided ventilation openings.
8. Flammable materials must not be stored in close
proximity to your boiler.
9. Avoid skin contact when your boiler is in operation, as
some surfaces may get hot e.g. pipework.
10. Ensure that the flue terminal, outside the house,
does not become damaged or obstructed, particularly
by foliage.
11. It is important that the condensate drain system is
not blocked, modified or damaged in any way as this
would affect the operation of your boiler. Your installer
should have insulated any exposed pipework.
5.2
The painted panels should be wiped with a damp cloth
and then dried completely. DO NOT USE ABRASIVE
CLEANING AGENTS.
For your Safety
- 200mm
- 200mm
- 5mm
- 5mm
- 5mm (In Operation)
- 450mm (For Servicing)
Cleaning the Outer case

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents