Completion - Baxi Combi 80Eco Installation And Servicing Instructions

Gas fired wall mounted combination boiler
Hide thumbs Also See for Combi 80Eco:
Table of Contents

Advertisement

10.0 Completion

Case Front Panel
10.1
Completion
1. Hinge the facia panel upwards and refit the
case front panel. Secure them with the screws
previously removed (Fig. 45).
2. Instruct the user in the operation of the boiler
and system, explaining the operational sequence.
3. Carefully read and complete all sections of the
"Benchmark" Installation, Commissioning and
Service Record Log Book that are relevant to the
appliance and installation. The details of the Log
Book will be required in the event of any warranty
work. The Log Book must be handed to the user
for safe keeping and each subsequent regular
service visit recorded.
4. Hand over the Users Operating, Installation
and Servicing Instructions and the Log Book,
Facia Panel
giving advice on the necessity of regular
servicing.
Fig. 45
24

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents