Dell PowerEdge 2800 Hardware Installation page 7

Installing the 1 x 2 scsi backplane
Hide thumbs Also See for PowerEdge 2800:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
F6590bk0.book Page 5 Tuesday, July 6, 2004 4:33 PM
5
Attach the drive rails to the drive cage.
Align the screw holes on the drive rails with the screw holes located near slot 1
a
on the drive cage.
Insert the 6 x 32 screws (4) into the drive rails and drive cage. See Figure 1-2.
b
Use a #2 Phillips screwdriver to tighten the screws on each rail. See Figure 1-2.
c
6
With the power connector pointing towards the top of the system, insert the drive cage
into the peripheral drive bay until it snaps into place. See Figure 1-3.
Figure 1-2. Installing the Drive Cage Rails
drive rails (2)
screws (4)
Installing the 1 x 2 SCSI Module
1-5