Setting Up The System; Pre-Installation Requirements - Acer AT350 F2 Series Service Manual

4u dual socket rack-mountable tower server
Hide thumbs Also See for AT350 F2 Series:
Table of Contents

Advertisement

18

Setting up the system

Pre-installation requirements

Selecting a site
Before unpacking and installing the system, select a suitable site for the
system for maximum efficiency. Consider the following factors when
choosing a site for the system:
Near a grounded power outlet.
Clean and dust-free.
Stable surface free from vibration.
Well-ventilated and away from sources of heat.
Secluded from electromagnetic fields produced by electrical devices
such as air conditioners, radio and TV transmitters, etc.
Checking the package contents
Check the following items from the package:
AT350 F2 system
AT350 F2 accessory box
If any of the above items is damaged or missing, contact your dealer
immediately.
Save the boxes and packing materials for future use.
2 System setup

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents