Unit Installation
3.
UNIT INSTALLATION
The instructions and guidelines provided in this section cover hardware installation topics, such as wall
mounting, rack mounting, and installing the unit. Refer to
before getting started. These instructions are presented as follows:
•
Tools Required on page 20
•
Mounting Options on page 21
•
Grounding Instructions on page 23
•
Supplying Power to the Unit on page 24
For information on configuring a specific application, refer to the quick configuration documents provided
on your AOS Documentation CD. For details on the CLI, refer to the AOS Command Reference Guide (also
included on your CD). All documents related to the Total Access 900 Series are also available online at
http://kb.adtran.com.
To prevent electrical shock, do not install equipment in a wet location or during an
electrical storm.
Tools Required
The following customer-provided tools are required for the hardware installation of the Total Access 900
Series:
•
Two wood screws, 3/32-inch to 1/8-inch (1-inch or greater length)
•
Drill and drill bit set
•
Screwdriver (medium)
•
25-pair male amphenol cable (customer connection)
•
Selected punch-down block and tool
•
To access the Total Access 900 Series CLI, you must have a VT100 terminal or PC with
terminal emulation software and a
•
To access the Total Access 900 Series GUI, you must have a PC connected to an IP
network.
•
Refer to your Total Access 900 Series quick start guide provided on the AOS
Documentation CD or available online at
to access the GUI and the CLI.
20
Total Access 900 Series Hardware Installation Guide
Unpack and Inspect the System on page 14
port cable.
CRAFT
http://kb.adtran.com
Copyright © 2010 ADTRAN, Inc.
for instructions on how
61210916L1-34G