HP SN3000B Quick Start Instructions page 4

B-series 16gb fc switches
Hide thumbs Also See for SN3000B:
Table of Contents

Advertisement

4.
Attach each outer rail as shown in
4).
The rails are labeled Left and Right to designate
the left side and right side of the rack as viewed
from the front of the cabinet.
Figure 5 Attaching the outer rails
a.
Slide the rail over the rear mounting bracket.
b.
Attach the front of the rail to a front rack
upright column using two Phillips screws and
adapter washers.
c.
Attach the outer rail to the rear mounting
brackets using a Phillips screw.
TIP:
Tighten the rear screws just
enough for the end of the screw to go
through the rear bracket. Later in the
procedure, you will need room to slide
the inner rail between the screw head
and the outer bracket.
5.
From the front of the rack, slide the switch (with
inner rails attached) onto the outer rails, taking
care to align the inner rails with the attachment
screws on the outer rails at the rear of the rack.
See
Figure 6 (page
Figure 6 Installing the switch in the rack
6.
When the switch is in place, secure the inner rails
to the outer rails by tightening the screws at the
rear of the rack.
7.
At the front of the rack, run the switch power cords
from the sides of the rack through the cutouts in
the rail, and then connect them to the switch
Figure 5 (page
4).
power supplies. Connect two power cords to the
48-port switch. Connect one power cord to the
24-port switch. See
IMPORTANT:
cords do not come in contact with any
sharp edges.
NOTE:
(optional) power supply, the 24-port switch
will also have two power cords.
Figure 7 Connecting power and installing the
plenum
1. Cutouts for power cords
2. Power cable plugs
8.
Connect the other end of the power cords to
power sources on separate circuits to protect
against AC failure. (Make sure that two power
cords are connected to the 48-port switch and
one power cord is connected to the 24–poort
switch.)
NOTE:
(optional) power supply, the 24-port switch
will also have two power cords.
9.
Power on the power supplies by setting the power
switches to the ON position (|).
The power supply LEDs are amber until the Power
On Self Test (POST) is complete, and then change
to green. The HP SN6000B 16Gb FC Switch
takes several minutes to boot and complete POST.
NOTE:
the power supply switches and LEDs.
However, the LEDs are visible through the
air holes in the front of the plenum.
10. Slide the plenum over the nonport side of the inner
rails, taking care to bypass the power cables. See
Figure 7 (page
1 1. Tighten the thumbscrews to secure the plenum to
the front of the rack.
Page 4
Figure 7 (page
4).
Make sure that the power
If you are configuring the second
3. Power switches
4. Plenum thumb screws
If you are configuring the second
When installed, the plenum covers
4).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sn6000b

Table of Contents