HP P9000 Manual page 31

Site preparation guide
Hide thumbs Also See for P9000:
Table of Contents

Advertisement

Figure 8 Service clearances for a three rack system (right module)
Table 18 Floor load rating and required clearances for a three rack configuration (right module)
Floor Load
Required Clearance (a+b) m
Rating
Clearance (c) m
(kg/m2)
C=0
500
0.1
450
0.4
400
0.8
350
1.4
C=0.2
C=0.4
0
0
0.3
0.1
0.6
0.5
1.2
1.0
Service clearance, floor cutout, and floor load rating
C=0.6
C=0.6
0
0
0
0
0.3
0 .1
0.8
0.5
31