General Site Preparation Guidelines
Sample Site Inspection Checklist
Table 2-6
Site Inspection Checklist (Continued)
Please check either Yes or No. If No, include comment number or date
24.
Is there a fire protection system in the
computer room?
25.
Is antistatic flooring installed?
26.
Are there any equipment servicing hazards
(loose ground wires, poor lighting, and so on)?
Cooling
Number
Area or condition
27.
Can cooling be maintained between 5°C and
35°C (up to 5000 ft)? Derate 1 °C/1000 ft above
5000 ft and up to 10,000 ft.
Can temperature changes be held to 5 °C per
28.
hour with tape media? Can temperature
changes be held to 20 °C per hour without tape
media?
29.
Can humidity level be maintained at 40% to
55% at 35 °C noncondensing?
30.
Are air-conditioning filters installed and clean?
Storage
Number
Area or condition
31.
Are cabinets available for tape and disc media?
32.
Is shelving available for documentation?
Training
Number
Area or condition
33
Are personnel enrolled in the System
Administrator's Course?
34
Is on-site training required?
42
Comment
or Date
Yes
No
Yes
No