Installing The Rack Front Panel And Control Panel Assembly - Dell PowerEdge 2800 Conversion Manualline

Tower-to-rack and rack-to-tower conversion guide
Hide thumbs Also See for PowerEdge 2800:
Table of Contents

Advertisement

Y1001bk0.book Page 14 Thursday, July 8, 2004 4:32 PM
Figure 1-6. Removing/Installing the Control Panel Assembly and Front Panel
screws (3)
T-10 Torx
screws (22)
Using a T-10 Torx driver, remove the 22 screws that secure the tower front panel to the drive
tray. See Figure 1-6.

Installing the Rack Front Panel and Control Panel Assembly

Install the rack front panel
Orient the system as shown in Figure 1-6.
a
Using a T-10 Torx driver, install the 22 screws (that came in your kit) that secure the rack
b
front panel to the drive tray.
NOTE:
rack systems. Only the carrier is different. When converting your tower system to a rack system, you must
remove the LCD board and the I/O board from the control panel assembly that you removed in step 2 of
"Removing the Control Panel Assembly and Tower Front Panel."
14
Tower-to-Rack and Rack-to-Tower Conversion Guide
control panel
cable clamp
The control panel assembly's LCD board and the I/O board are the same for both the tower and
drive tray in
maintenance
position
front panel
control panel
assembly

Advertisement

Table of Contents
loading

Table of Contents