Assembly; Plastic Shield Installation; Nylon Head Installation - Echo SRM-211 Operator's Manual

Table of Contents

Advertisement

12
A
SSEMBLY
Use only ECHO approved attachments. Serious injury may result from using non-approved attachment combinations.
Read and comply with all safety instructions listed in this manual and attachment manual.
ECHO, INC. will not be responsible for the failure of cutting devices, attachments, or accessories which have not
been tested and approved by ECHO for use with these units.
Tools Required: Screwdriver, Head Locking Tool, 17x19mm T-Wrench
Parts Required: Plastic Shield, Shield Plate, three (3) 5mm x 16mm
screws, Nylon Line Head

PLASTIC SHIELD INSTALLATION

(for Nylon Line Operation)
NOTE
The plastic shield is for use with the Nylon Line Head only.
Install Metal Shield when using plastic or metal blades.
1. Remove plastic sleeve and upper plate (A) from PTO shaft.
2. Install the shield on the bottom of the bearing housing flange.
3. Place shield plate (B) on shield, align holes and install three (3)
5x16 mm screws.
4. Install upper plate (A).
NYLON LINE HEAD INSTALLATION
1. Align hole in upper plate with notch in edge of gear housing and
insert head locking tool (C). Remove plastic sleeve from PTO shaft.
2. Be sure upper plate (A) remains on PTO shaft.
3. Thread line head onto PTO shaft by turning it counter clockwise
until head is tight against upper plate.
4. Remove locking tool (C).
WARNING
DANGER
B
A
C

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents