Removing, Installing, and Verifying Supervisor, Switching, and Services Modules
S e n d d o c u m e n t a t i o n c o m m e n t s t o m d s f e e d b a c k - d o c @ c i s c o . c o m .

Installing Supervisor Modules

In a Cisco MDS 9513 Director, slots 7 and 8 are reserved for the Supervisor-2 modules. In the Cisco
MDS 9509 Director, slot 5 is reserved for the Supervisor-2 or Supervisor-1 module. In the Cisco MDS
9506 Director, slot 5 is reserved for the Supervisor-1 module. Slot 6 in the Cisco MDS 9509 and 9506
Directors is reserved for an additional redundant supervisor module in case the supervisor module in
slot 5 fails. See
Supervisor-1 modules and Supervisor-2 modules cannot be used in the same switch, except for migration
purposes. Both the active and standby supervisor modules must be of the same type, either Supervisor-1
or Supervisor-2 modules. For Cisco MDS 9513 Directors, both supervisor modules must be Supervisor-2
modules.
Before installing any modules in the chassis, Cisco recommends installing the chassis in the rack. See
Step 1
the
Verify that there is enough clearance to accommodate any cables or interface equipment that you want
Step 2
to connect to the module.
Step 3
Verify that the captive screws are tightened to 8 in-lb on all modules already installed in the chassis. This
ensures that the EMI gaskets are fully compressed and maximizes the opening space for the module
being installed.
If a filler panel is installed, remove the two Phillips pan-head screws from the filler panel and remove
Step 4
the panel. To remove a currently installed module, see the
Modules" section on page
Open both the ejector levers on the new or replacement module completely. (See
Step 5
Cisco MDS 9500 Series Hardware Installation Guide
2-40
Figure 1-3 on page 1-6
"Installing the Chassis in a Cabinet or Rack" section on page
2-45.
Chapter 2
and
Figure 1-4 on page 1-7
2-6.
"Removing Other Switching and Services
Installing the Cisco MDS 9500 Series
for slot locations.
Figure
2-22.)
OL-17467-02

Advertisement

Table of Contents
loading

Table of Contents