Asus RS720Q-E7/RS12 User Manual page 25

2u rackmount server
Hide thumbs Also See for RS720Q-E7/RS12:
Table of Contents

Advertisement

2.
Press the left load lever with your
thumb (A), then move it to the left
(B) until it is released from the
retention tab.
To prevent damage to the socket
pins, do not remove the PnP cap
unless you are installing a CPU.
3.
Slightly lift the load lever in the
direction of the arrow.
4.
Press the right load lever with your
thumb (C), then move it to the right
(D) until it is released from the
retention tab. Lift the load lever in
the direction of the arrow (E).
ASUS RS720Q-E7/RS12, RS724Q-E7/RS12, RS726Q-E7/RS12
A
B
Load lever
C
E
D
2-5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rs724q-e7/rs12Rs726q-e7/rs12

Table of Contents