Rough-In Dimensions; Foreword - A.O. Smith SERIES 100 Installation & Operating Instructions Manual

Series 100 and 101 commercial gas water heater gas-fired power burner for domestic hot water
Hide thumbs Also See for SERIES 100:
Table of Contents

Advertisement

GAS VALVE PIPING
BTH-120, 199 & 250
1/2" NPT
BTH-150
3/4" NPT
Table 1. RECOVERY CAPACITIES - NATURAL GAS / L.P.
Input
Gas
Model
BTU/Hr.
Usage
BTH 120 120,000
nat/lp
BTH 150 150,000
nat/lp
BTH 199 199,900
nat/lp
BTH 250 250,000
nat/lp
Gas
Model
kW-Hr
Usage
BTH 120
35
nat/lp
BTH 150
44
nat/lp
BTH 199
58
nat/lp
BTH 250
73
nat/lp
Recovery capacities are based on 95% thermal efficiency.
These designs comply with the current edition of the American National
Standard for Gas Water Heaters, Volume III, ANSI Z21.10.3 / CSA 4.3 as an
automatic circulating tank water heater, and automatic storage water
heaters.
Detailed installation diagrams are found in this manual. These diagrams will
serve to provide the installer with a reference for the materials and methods
of piping necessary. It is highly essential that all water, gas piping and
wiring be installed as shown on the diagrams.
Particular attention should be given to the installation of thermometers at
the locations indicated on the diagrams as these are necessary for checking
the proper functioning of the heater.
CYCLONE Xi BTH 120 - 250A ROUGH-IN-DIMENSIONS
Approx.
Gallon
TEMPERATURE RISE - DEGREES °F - GALLONS PER HOUR
Capacity
30
60
461
100
576
100
767
100
960
Approx.
Liter
Capacity
17
227
1744 1308 1046 872
379
2179 1635 1308 1090 934
379
2904 2178 1743 1452 1245 1089 968
379
3632 2724 2179 1816 1557 1362 1211 1090 991
40
50
60
70
345
276
230
197
173
432
345
288
247
216
575
460
384
329
288
720
576
480
411
360
TEMPERATURE RISE - DEGREES C - Liters PER HOUR
22
28
33
39
44
747
654
817

FOREWORD

In addition to these instructions, the equipment shall be installed in
accordance with those installation regulations in force in the local area
where the installation is to be made. These shall be carefully followed in all
cases. Authorities having jurisdiction should be consulted before
installations are made.
In the absence of local codes, the installation must comply with the current
editions of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and the
National Electrical Code, NFPA 70 or CAN/CSA-B149.1, the Natural Gas and
Propane Installation Code and CSA C22.1, the Canadian Electrical Code. All
documents are available from the Canadian Standards Association, 8501
East Pleasant Valley Road, Cleveland, OH 44131. NFPA documents are also
available from the National Fire Protection Association, 1 Batterymarch
Park, Quincy, MA 02269.
2
80
90
100
110
120
154
138
126
115
192
173
157
144
256
230
209
192
320
288
262
240
50
56
61
67
581
523
476
436
726
654
594
545
871
792
726
908
130
140
106
99
133
123
177
164
221
206
72
78
402
374
503
467
670
622
838
778

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents