SYSTEM CONTROL KIT
Designed for use with the SWG Series Power Venter for controlling Natural
Gas or L.P. Gas draft induced appliances.
I
TEMS INCLUDED IN KIT
1) Junction box with mounted pressure switch and post purge timer
1) 2 ft. length of 1/4 inch aluminum tubing
2) Flexible conduit connector
1) 4" MG1 Barometric Draft Control
1) 1/4 inch tubing connector
THESE INSTRUCTIONS MUST REMAIN WITH EQUIPMENT
Model: CK-43F
DO NOT DESTROY
Page 1

Advertisement

loading

Summary of Contents for Field Controls 46285100

  • Page 1 SYSTEM CONTROL KIT Model: CK-43F Designed for use with the SWG Series Power Venter for controlling Natural Gas or L.P. Gas draft induced appliances. TEMS INCLUDED IN KIT 1) Junction box with mounted pressure switch and post purge timer 1) 2 ft. length of 1/4 inch aluminum tubing 2) Flexible conduit connector 1) 4"...
  • Page 2: Installation

    INSTALLATION Typical Vent System Layout OUNTING UNCTION The junction box can be mounted at the venter or remotely mounted away from the venter. (See Figure 1 & Figure 2) 1. Remove one of the knockouts from the side of the junction box where the pressure switch is mounted.
  • Page 3 DRAFT CONTROL INSTALLATION CAUTION: This draft control is shipped as a single acting draft control. If the draft control is not being used on a gas draft induced furnace, remove the gate stop on the draft control ring before installing. OLLAR NSTALLATION This control is shipped with a collar patterned to fit a single wall round vent pipe.
  • Page 4 RAFT ETTING When adjusting the control, two things are essential: 1. The burner must be operating for at least 10 minutes to obtain maximum chimney draft. 2. An analysis of the flue gases is necessary to determine the percentage of and check for presence of CO.
  • Page 5 Diagram A Diagram B INTERNAL WIRING FOR CK-CONTROL KIT: DIAGRAM A & B L1 to 1 on post purge timer T2 to timer relay base M to 3 on post purge timer T3 to N/O on pressure switch T1 to common on pressure switch Timer base to common on pressure switch Page 5...
  • Page 6: Troubleshooting Hints

    SYSTEM CONTROL CHECK OUT PROCEDURES 1. For furnaces or boilers, adjust the thermostat to call for heat and observe the power venting system for proper operation sequence. (Repeat if necessary) a. Thermostat calls for heat. b. Relay is energized and venter motor starts. c.
  • Page 7 INSTALLATION INFORMATION CK-43F MODEL NO.:_____________________________________________________________ INSTALLER'S NAME:______________________________________________________ INSTALLER'S COMPANY:__________________________________________________ INSTALLER'S PHONE NO.:_________________________________________________ DATE OF INSTALLATION: _________________________________________________ Page 7...