Tractor Pre-Operation Inspection/Service; Sickle Bar Pre-Operation Inspection/Service - Alamo Industrial Switchblade Sickle Bar 5 Operator's Manual

Alamo industrial switchblade sickle bar operator's manual
Table of Contents

Advertisement

5.1 Tractor Pre-Operation Inspection/Service

Refer to the tractor operator's manual to ensure a
complete pre-operation inspection and scheduled
service
is
performed
manufacturers recommendations.
are some of the items that require daily service and
inspection:
Tire condition/air pressure
Wheel lug bolts
Steering linkage
PTO shield
SMV sign is clean and visible
Tractor's lights are clean and functional
Tractor Seat belt is in good condition
Tractor ROPS is in good condition
ROPS is in the raised position
No tractor oil leaks
Radiator free of debris
Engine oil level and condition
Engine coolant level and condition
Power brake fluid level
Power steering fluid level
Fuel condition and level
Sufficient lubrication at all lube points
Air filter condition OPS-U-0030

5.2 Sickle Bar Pre-Operation Inspection/Service

Before each Sickle Bar use, a complete inspection and service is required to ensure the Sickle Bar is in a
good and safe working condition.
immediately. To ensure the Sickle Bar is ready for operation, conduct the following. OPS-SB-0001
Periodically inspect all moving parts for wear and replace when
necessary with authorized service parts. Look for loose fasteners, worn
or broken parts, and leaky or loose fittings. Make sure all pins have
cotter pins and washers. Serious injury may occur from not maintaining
this machine in good working order.
SB5/6 03/09
© 2009 Alamo Group Inc.
OPERATION
according
to
the
The following
Damaged and/or broken parts should be repaired and/or replaced
Operation Section 3-9
(SG-21)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Switchblade sickle bar 6Switchblade 5Switchblade 6

Table of Contents