Miele PT 7136 Operating And Installation Manual page 39

Vented dryer
Table of Contents

Advertisement

Installation
Do not install a lockable or slide
door in the pivoting area of the dryer
door.
Transporting the dryer to the
installation site
The rear overhang of the lid has
transport grips.
Use the front dryer feet and the rear
overhang to transport the dryer from
the packaging base to the installation
site.
Level the dryer
The dryer must be level to ensure safe
and proper operation.
The machine can be leveled by
turning the legs clockwise or
counterclockwise as necessary.
An air gap of
be provided between the machine
and the floor. The vents must not be
blocked by toe kicks, long piled
carpet, etc.
The appliance is not intended to be
mounted in a wall or other vertical
surface of a building or cabinet. The
unit is allowed for built-in
application.
The machine may not be
operated without the lid in place.
Installation
3
/
" (10 mm) must
8
39

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pt 7138 plus

Table of Contents