Download Print this page

Alamo Industrial Machete T 7740 Information & Service Bulletin page 66

Almo industrial boom arm mower information and service bulletin

Advertisement

SERVICE BULLETIN No. 962503-2
Models:
Machete Boom Mowers
Labor:
Parts:
2.0 hr. at Dealer registered
100 % at Dealer Net
Shop Rate
Lower Crossmember Kit Installation:
Subject:
Install lower frame rail crossmember kit to reduce frame rail deflection and movement.
Service Required:
1.
Install Crossmember between frame rails under tractor and aligned with the upright section of
frame rails as shown in figure 1.
2.
Using large C-Clamps clamp the crossmember uprigts to the frame rails. The bolts in the
crossmember will need to be loose when you do this, the holes for these bolts are slotted.
3.
Weld the uprights of the cross member to the upright of the frame rail on both sides. retighten the
bolts in cross member. Cleand welded are and repaint welded are and crossmember. 2 Cans
Spay Paint, High Gloss Black (Obtain Locally)
Parts Required:
Weld Here both side and
both frame rails
Figure 1
Warranty Compensation will be provided following proper filing of warranty claim in accordance with
the Alamo Industrial Warranty Policy. Claim allowance may vary in accordance with laws governing a
specific region. Any Warranty associated with this service bulletin must be within authorized dates.
MACHETE
© 2005 Alamo Group Inc.
Alamo Industrial Technical Services Department
1502 East Walnut
Seguin, Texas 78155
830-372-2708
S/N MB21-01001 to 01015 (& PT002)
S/N MB24-01001 to 01012 (& PT002)
Part No.
Qty
02970118
1
Bulletin No:
962503-2
(Old # 960002)
Old Parts Disposition:
No Returnable Parts
involved
Description
Frame Rail Support Kit
Frame Rail, RH Shown
Frame Rail Support Kit
P/N 02970118
2-8
Date:
Mar. 25, 1996
Termination Date:
Oct. 1, 1996

Advertisement

loading

This manual is also suitable for:

Machete mb21Machete mb24