Download Print this page

Alamo Industrial Axtreme 02984405 Assembly Manual page 93

Alamo industrial boom arm mower assembly manual

Advertisement

FIGURE 18
Installing Wire Harness
To Valve:
1.
Wire Harness From Cab to Front. The
wire harness runs out the bottom of the Cab
on the right hand side. Run harness along
under RH cab of Tractor to the control valve
(See Figure 21). Note the wire harness runs
bottom of cab and near the exhaust from the
Tractor to the Stack Valve to the front of the
tractor. Make certain to tie the Harness or
Hoses to the Tractor for protection.
2.
Gaskets on Valve Terminals. There
are 5 wire terminals on Valve,
3.
Wire Harness Terminal Identification.
The Wire Harness Terminal Plugs are marked
in writing on the plug. Swing, Lift, Dipper, Tilt
and Door terminal plugs (5 Total). The Valve
terminals are in this same order starting at the
input cap end and going toward the blank end.
4.
Wire Harness Terminal Installation.
You will need to feed wire harness under the
fitting of hoses to valve. (See Figure 20 & 21)
lay the Plugs out in the Order they are to be
installed starting at the far end terminal.
Axtreme Boom (Asy Man) 07/06
© 2006 Alamo Industrial
Joystick Mounting
FIGURE 19
Section 9 - 9
FIGURE 20
FIGURE 21

Advertisement

loading

This manual is also suitable for:

Axtreme