Download Print this page

FUTABA CONTEST-7 Instruction Manual

Digital proportional radio control

Advertisement

Quick Links

Advertisement

loading

Summary of Contents for FUTABA CONTEST-7

  • Page 3: Special Features

    •Output shaft is supported by miniature ball bearings. Extremely smooth operation. Superior durability. 20~ motor. • Potentiometer drive section is separately driven through a one-stage gear. Element life is extremely long. •Special reinforced plastic, ultraprecision, powerful gear. CONTENTS AND RATINGS OF CONTEST-7 SET Receiver use nickel-cadmium battery NR-4E Transmitter FP-T7G...
  • Page 5 CHARGE THE NICKEL-CADMIUM BATTERY BEFORE USING •Connect theTX jack of the FBC-2(F) charger to the charging jack of the transmitter and the RX jack of the charger to the receiver/servo nickel-cadmium battery and connect the Charger to an AC 117V (220V, 240V) socket. The TX and RX LE D of the charger will be lighted to indicate that the battery is being charged.
  • Page 6 HANDLING 2-way level meter Antenna Handle Battery check switch Charging jack 6 channel lever 5 landing gear switch Dual travel elevator switch and trimmer 7 Channel lever Dual travel aileron switch and trimmer Power switch Adjust knob •Unlocked 4 rudder •Set the length by turning the entire knob and then lock 2 elevator...
  • Page 7 •Refer to Fig.2 for the operation of each channel and the name of each part. •When the power switch is set to ON, the pointer of the level meter will deflect. Since this indicates the antenna output, it should deflect to graduation 7.
  • Page 8 •The antenna wire is color coded by frequency (band). •The connector wiring order is shown in Fig.6. •Pack the entire receiver in sponge and mount so that the antenna wire is as straight as possible. •Refer to Fig.4 when mounting the servo.
  • Page 10 GUARANTEE Your NEW FUTABA Digital Proportional R/C system is guaranteed against de- fects in workmanship and material for 180 days from the date of purchase when the attached registration card is returned to us within ten days of purchase. This Guarantee is null and void if the R/C system has been improperly handled,...
  • Page 11: Factory Repair Service

    7 Include a packing list of all items being returned, and double check to make sure that all items are packed 8. Upon receipt of damaged equipment at the FUTABA factory, an estimate of the cost of repair will be sent to you Your equipment will then be repaired and returned to you upon receipt of payment.

This manual is also suitable for:

Fp-7gFp-t7gFp-r7lFp-s15Fp-s15lFp-s15g