Configuring The Virtual Array; Introduction; Preliminary Operations - Compaq 3000R - ProLiant - 128 MB RAM Installation Manual

Hewlett-packard va 7100/7400 microsoft cluster services installation guide for hp netservers
Hide thumbs Also See for 3000R - ProLiant - 128 MB RAM:
Table of Contents

Advertisement

3 Configuring the Virtual Array

Introduction

This chapter contains detailed instructions for setup and configuration of the virtual array.

Preliminary Operations

The following preliminary operations must be successfully completed before beginning the
Configuration
Procedure.
1. Ensure that all requirements detailed in chapter 2 have been thoroughly reviewed and successfully completed.
2. Storage array is powered up.
3. Node 1 (primary node) is powered up and running.
4. Verify that all network cables and fiber cables are connected correctly and securely. The HBAs should display a
flashing green light and a constant orange light. The orange light indicates that a link has been established.
5. The CD included in the VA equipment shipment should contain Surestore Command View SDM software.
Refer to the
Equipment Required
6. If applicable, the local RAID disk arrays on both nodes and external storage array must be configured identically.
For example, use the same driver letters and labels for local hard drives, CD-ROMs, and drives on the external
disk storage array. Otherwise, the cluster will not function after fail-over from active node to passive node.
Refer to the
Hardware Connections
7. If applicable, ensure that the Backend and VPN network interfaces are disconnected. They can be reconnected at
the completion of this procedure. Refer to the
CAUTION
NOTE
10/12/01
paragraph of chapter 2. This CD contains all required management software.
paragraph of chapter 2.
The storage array should be powered up before either server node is powered up. Also, power
down both server nodes before the storage array is powered down.
Ensure that the latest version of the HP Surestore Command View SDM software is being used.
Refer to the
Equipment Required
chapter 2.
Hardware Connections
paragraph of chapter 2.
and
Applicable Documents/Reference Material
VA 7100/7400 Cluster Installation Guide
Virtual Array Setup and
paragraphs of
5

Advertisement

Table of Contents
loading

Table of Contents