Installing The Series 4100Gl Switches; Included Parts - HP J4865A Installation And Getting Started Manual

Procurve series 4100gl switches
Hide thumbs Also See for J4865A:
Table of Contents

Advertisement

Installing the Series 4100gl Switches

The HP Series 4100gl Switches are easily installed. They come with an acces­
sory kit that includes the brackets for mounting the switch in a standard 19-
inch telco rack, in an equipment cabinet, or on a wall. The switches have
rubber feet already attached so they can be securely located on a horizontal
surface.
This chapter shows you how to install the Series 4100gl Switches.

Included Parts

The Series 4100gl Switches and Bundles have the following components
shipped with them:
HP ProCurve Series 4100gl Switches Installation Guide (5990-3005), this
manual
HP ProCurve Series 4100gl Switches Documentation CD ROM
(contains a PDF file copies of the HP ProCurve Series 4100gl Switches
Management and Configuration Guide, this Installation and Getting
Started Guide, and other related documentation)
HP ProCurve Manager for Hubs & Switches - CD ROM and booklet
Customer Support/Warranty booklet
Accessory kit (5065-6521 for the 8-slot Switch 4108gl and Switch 4108gl
Bundle; 5064-9943 for the 4-slot Switch 4104gl and Switch 4148gl):
two mounting brackets
six or four 10 mm M4 screws to attach the mounting brackets to the
switch
four 5/8-inch number 12-24 screws to attach the switch to a rack
Console cable
Power cord, one of the following:
Australia/New Zealand
8120-6803
China
8120-8377
Continental Europe
8120-6802
Denmark
8120-6806
Japan
8121-0606
Switzerland
United Kingdom/
Hong Kong/Singapore
United States/Canada/Mexico
2
8120-6807
8120-8709
8121-0605
2-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents