Figure 10
Mounting the Controller in a 19-Inch Rack
1
#10-32 pan-head screws or #12-24 slotted head screws
After the controller is mounted in the rack, perform the following tasks to complete the
Step 3
installation:
Connecting the Controller Console Port
•
Securing the Power Adapter Cable
•
Connecting to the Network
•
Step 4
For configuration instructions about using the CLI setup program, see the
Bootup Script and Power-On Self Test" section on page
20
1
23.
"Running the