Installation Instructions; Unpacking Your Dryer; Tools And Materials Required - Haier HDY6-1 User Manual

Front load electric dryer
Hide thumbs Also See for HDY6-1:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION INSTRUCTIONS

• Select a suitable location for the dryer on a hard, even surface away from
direct sunlight or heat source, e.g. radiators, baseboard heaters, cooking
appliances, etc. Any floor unevenness should be corrected with the leveling
legs located on the bottom of the dryer.

Unpacking Your Dryer

1. Remove all packaging material. This includes the foam base and all adhesive
tape holding the dryer accessories inside and outside.
2. Inspect and remove any remains of packaging, tape or printed materials
before using the dryer.

Tools and Materials Required

• Phillips head and flathead screwdrivers
• Channel-lock adjustable pliers
• 1/2 inch open end wrench
• Carpenter's level
• Measuring tape (12ft. min.)
• Duct tape
• Rigid or flexible metal 4 inch (10.2 cm) duct
• Vent hood
• To ensure that the dryer is operating efficiently, attention must be paid to the
following:
• The dryer must be horizontally installed. Its bottom is equipped
with adjustable legs. Adjust these 4 legs to level before operation.
• Check whether there is any damage to the dryer during transportation. Any
damaged dryer must not be installed.
• The dryer must be kept away from flammable or detonable substances.
• The surrounding environment must be dry and ventilated.
• Do not install the dryer on any carpet.
• To allow the dryer to perform better, the ambient temperature should not be
lower than 50˚C or higher than 95˚F.
English
6

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hdy6-1c

Table of Contents