Haier AB092FCAHA Operation And Installation Manual page 18

Cassette type
Hide thumbs Also See for AB092FCAHA:
Table of Contents

Advertisement

Installation Procedure
3
3. PREPARATION FOR THE INSTALLATION
(1) Position of ceiling opening between unit and suspending bolt.
(2) Cut an opening in ceiling for installation if necessary. (when ceiling already exists.)
Refer to paper pattern for dimension of ceiling hole.
Connect all pipings (refrigerant, water drainage), wirings (inter unit cable) to indoor unit, before installation.
Cut a hole in ceiling, may be a frame should be used to ensure a smooth surface and to prevent vibration.
Contact your real estate dealer
(3) Install a suspending bolt.
(Use a M10 bolt)
To support the unit weight, anchor bolt shall be used in the case of already exists ceiling. For new
ceiling, use built-in type bolt or parts prepared in the field.
Before going on installing adjust space between ceiling.
<Installation example>
Distance between
suspending bolts 460mm
570(Indoor unit)
600(Ceiling opening)
630(Ornament panel)
Roof
Anchor bolt
Long nut
Suspending bolt
Note: All the above mentioned parts shall be prepared in field.
Ceiling
Overlap between ceiling and
ornament panel shall be 15mm
Ceiling
Ornament panel
16
Suspending bolts

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents