Test Summary; Definitions; Equipment - Texas Instruments bq2570 Series User Manual

Evaluation module
Table of Contents

Advertisement

www.ti.com
2

Test Summary

2.1

Definitions

This procedure details how to configure the PWR732 evaluation board. For the test procedure, the
following naming conventions are followed. Refer to the
VXXX:
LOADW:
V(TPyyy):
V(Jxx):
V(TP(XXX)):
V(XXX, YYY):
I(JXX(YYY)):
Jxx(BBB):
Jxx ON :
Jxx OFF:
Jxx (-YY-) ON:
Measure: → A,B
Observe → A,B
Assembly drawings
2.2

Equipment

The following list of equipment is required for fully testing the EVM:
1. Power Supplies
A power supply capable of supplying 24 V at 6 A is required. While this part can handle larger voltage
and current, it is not necessary for this procedure.
2. Load #1
A 0- to 20-V/0- to 6-A, system DC electronic load and setting as constant voltage load mode.
3. Load #2
A Kepco load: BOP36-6M, DC 0 to ±36 V, 0 to ±6 A (or higher), or equivalent.
4. Meters
Six Fluke 75 multimeters, (equivalent or better) or: Four equivalent voltage meters and two equivalent
current meters.
5. Computer
A computer with at least one USB port and a USB cable.
6. EV2400 Communication Kit
7. Software
Download and properly install bqstudio (Version: 1.3.45 or newer) from http://www.ti.com/tool/bqstudio.
SLUUBG6 – May 2017
Submit Documentation Feedback
External voltage supply name (VADP, VBT, VSBT)
External load name (LOADR, LOADI)
Voltage at internal test point TPyyy. For example, V(TP12) means the
voltage at TP12.
Voltage at jack terminal Jxx.
Voltage at test point "XXX". For example, V(ACDET) means the voltage at
the test point which is marked as "ACDET".
Voltage across point XXX and YYY.
Current going out from the YYY terminal of jack XX.
Terminal or pin BBB of jack xx
Internal jumper Jxx terminals are shorted
Internal jumper Jxx terminals are open
Internal jumper Jxx adjacent terminals marked as "YY" are shorted
Check specified parameters A, B. If measured values are not within
specified limits, the unit under test has failed.
Observe if A, B occurs. If they do not occur, the unit under test has failed.
have locations for jumpers, test points, and individual components.
Copyright © 2017, Texas Instruments Incorporated
PWR732 schematic
for details.
bq2570x Evaluation Module
Test Summary
5

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bq25703aevm-732Bq25700aevm-732

Table of Contents