Installation; Gas Connection - Smeg Concerto SX91MDS9 Manual

Table of Contents

Advertisement

5 Installation

5.1 Gas connection

Gas leak
Danger of explosion
• After carrying out any operation, check that
the tightening torque of gas connections is
between 10 Nm and 15 Nm.
• If required, use a pressure regulator that
complies with current regulations.
• At the end of the installation, check for
any leaks with a soapy solution, never
with a flame.
• Installation using a hose must be carried
out so that the length of the hose does
not exceed 2 metres when fully
extended for steel hoses.
• The hoses should not come into contact
with moving parts and should not be
crushed in any way.
• The adjustment conditions for this
appliance are shown on the gas setting
label.
General information
Connection to the gas mains can be made
using a continuous wall steel hose in
compliance with the guidelines established
by the standards in force. The appliance is
preset for natural gas G20 (2H) at a
pressure of 20 mbar. For supplying it with
other types of gas, see chapter "5.2
Adaptation to different types of gas".
The gas inlet connection is threaded ½"
external gas (ISO 228-1).
Installation
Connection with a steel hose
Make the connection to the gas mains
using a continuous wall steel hose whose
specifications comply with the applicable
standard.
Carefully screw the connector 3 to the gas
connector 1 of the appliance, placing the
seal 2 between them.
Connection with a steel hose with
bayonet fitting
Carry out the connection to the gas mains
using a steel hose with bayonet fitting
compliant with B.S. 669. Apply insulating
material to the thread of the gas hose
connector 4 and then tighten the adapter 3.
Screw the assembly to the movable
connector 1 of the appliance, placing the
supplied seal 2 between them.
81

Advertisement

Table of Contents
loading

Table of Contents