(System 4 Through 6); Transformer And Ground Connections; Network/Communication Cables And Connections - Pentair 3200 NXT Service Manual

Hide thumbs Also See for 3200 NXT:
Table of Contents

Advertisement

(SYSTEM 4 THROUGH 6)

1. In Service: System 4 Time Clock
4#
SRV
REGEN IN 07 DAYS
2. In Service: System 4 Flow Meter Initiated or System 4 Flow
Meter Delayed
4#
SRV* 03:45PM
VOLUME
3. In Service: System 5 Flow Meter Initiated (Lead Unit)
5#1 SRV* 03:45PM
VOLUME
4. In Service: System 5 Flow Meter Initiated (Lag Unit #3)
5#3 SRV
VOLUME
5. In Service: System 6 Flow Meter Initiated (Lead Unit)
6#1 SRV* 03:45PM
SYSVOL
TRANSFORMER AND GROUND
6 • 3200 NXT
FE12
03:45PM
1000 g
1000 g
03:45PM
1000 g
4000 g
CONNECTIONS
2750/2850/2900 Valves:
3150/3900 Valves:
IMPORTANT: Earth ground wire must be installed.
Installing the Transformer:
1. Locate the ground label to find the screw to attach the
ground wire on the transformer.
2. Remove the screw and attach the ground wire, and
re-attach the screw.
NETWORK/COMMUNICATION CABLES

Advertisement

Table of Contents
loading

Table of Contents