Mounting
4.2 Mounting the TCU on the operator panel front with mounting bracket
OP 010, OP 010S, OP 010C, OP 012, OP 015, OP 015A, TP 015A and OP 019
Two mounting brackets (must be ordered separately) are required for mounting these
operator panel fronts (see Section "Accessories (Page 87)").
1. Screw the mounting bracket
2. Use the two hinge catches
operator panel front.
3. Insert cables K1, K2 and K3 (only for OP 019).
4. Close the cabled TCU mounting bracket unit and attach it using the four knurled screws
Figure 4-1
28
①
2 x hinge catches
②
4 x knurled screws for attaching the mounting brackets to the operator panel front
③
2 x mounting brackets
④
10 mm clearance
Mounted TCU (example with OP 012) in front, side and rear view
③
onto the TCU.
①
to suspend the TCU mounting bracket unit (like a PCU) in the
Equipment Manual, 03/2023, A5E40874197B AD
②
.
TCU 30.3