  • Page 1 Installation, use and maintenance instructions 安装 , 使用以及维护说明书 Light oil burner 轻油燃烧器 Two stage operation 两段火运行 CODE - 编码 MODEL - 型号 TYPE - 型号 20024142 RG2D 380 T1 20024139 (1) - 05/2010...
  • Page 3: Burner Description

    INDEX BURNER DESCRIPTION ... . WORKING ..... . . 1.1 Burner equipment ....4.1 Combustion adjustment.
  • Page 4: Overall Dimensions

    TECHNICAL DATA 2.1 TECHNICAL DATA TYPE 380 T1 – – Output - Thermal power 3.6 / 4.1 10 kg/h 42 / 49 118 kW Fuel Light oil, max. viscosity at 20°C: 6 mm ± Electrical supply Single phase, 50Hz 230 V Motor Run current 0.9 A –...
  • Page 5: Fuel Supply

    INSTALLATION 3.1 BOILER FIXING Put on the flange (1) the screw and two nuts, (see fig. 3). Widen, if necessary, the insulating gasket holes (5), (see fig. 4). Fix the flange (1) to the boiler door (4) using screws (2) and (if necessary) the nuts (3) interposing the insulating gasket (5), (see fig.
  • Page 6: Hydraulic Systems

    3.3 HYDRAULIC SYSTEMS Fig. 7 WARNING: Before starting the burner make sure that the return pipe-line is not clogged. An excessive back pressure would cause the damage of the pump seal. The pump is designed to allow working with two pipes. In order to obtain one pipe working it is necessary to unscrew the return plug (2), remove the by-pass screw (3) and then screw again the plug (2), (see fig.
  • Page 7: Electrical Wiring

    3.4 ELECTRICAL WIRING NOTES: WARNING 2 section – Wires of 1 mm DO NOT EXCHANGE – The electrical wiring carried out by the installer must be in NEUTRAL WITH PHASE compliance with the rules in force in the Country. Connect 2nd stage thermostat between clamps T6 - T8 by removing the bridge.
  • Page 8: Recommended Nozzles

    WORKING 4.1 COMBUSTION ADJUSTMENT In conformity with Efficiency Directive 92/42/EEC the application of the burner on the boiler, adjustment and te- sting must be carried out observing the instruction manual of the boiler, including verification of the CO and CO concentration in the flue gases, their temperatures and the average temperature of the water in the boiler.
  • Page 9: Combustion Head Setting

    Fig. 12 Remove nozzle-holder assembly (1) after loos- ing screws (2) and nut (3), remove the small ca- b l e s ( 4 ) f r o m t h e c o n t r o l b o x a n d t h e photoresistance (5).
  • Page 10: Pump Pressure And Air Output

    4.5 PUMP PRESSURE AND AIR OUTPUT STAGE ADJUSTMENT ADJUSTMENT OF AIR SHUTTER: Unloosen the nut (1), turn the screw (2) until the indicator (3) Fig. 14 reaches the position desired. Then lock the nut (1), (see fig. 14). PRESSURE REGULATION: This is set at 9 bar at the factory.
  • Page 11: Maintenance

    MAINTENANCE Burner requires a periodic maintenance carried out by a qualified and authorized technicians. Maintenance is essential for the reliability of the burner, avoiding the excessive consumption of fuel and consequent pollution. Before carrying out any cleaning or control always first switch off the electrical supply to the burner acting on the main switch of the system.
  • Page 12: Faults / Solutions

    FAULTS / SOLUTIONS Here below you can find some causes and the possible solutions for problems that could cause a failure to start or a bad working of the burner. A fault usually makes the lock-out lamp light which is situated inside the reset button of the control box (4, fig.
  • Page 13 目录 燃烧器描述 ..... . . 工作 ......1.1 燃烧器附件...
  • Page 14 技术参数 技术参数 类型 380 T1 热出力 – – 3.6 / 4.1 10 kg/h 42 / 49 118 kW  燃料 轻油 , 在 20 °C 时粘度 6 mm 电源 单相 , ± 50Hz 230 V 马达 运行电流 0.9 A – 2720 rpm – 285 rad/s 4 F...
  • Page 15 安装 3.1 锅炉安装 将螺栓和螺母放在法兰 (1) 上 , ( 参见图 . 3).  如有必要,对石棉垫扩孔 (5), ( 参见图 . 4).  用螺栓 (2) 和螺母 (3) 将法兰 (1) 安装到炉门 (4) 上, 必须将石棉垫 (5) 放在中间 , ( 参见图 . 2).  图 . 2 图...
  • Page 16 3.3 液压系统 图 . 7 警告 : 启动燃烧器之前,确保回油管无堵塞 . 过大的背压会使泵的密封损坏 . 设计时泵是按双管运行的。如单管运行,须拧下回油螺钉 (2), 移开旁路 螺钉 (3) 后 再拧紧螺钉 (2). ( 参见图 . 7). 图 . 6 L (m) ø i ø i (m) 8 mm 10 mm D5713 供油管 真空表接口 回油管...
  • Page 17 3.4 电气连接 注意 : 警告 – 电线截面积:1 mm 不要将火线与零线接反 – 连线的安装必须符合所在国家的强制规定 . 移开 T6 和 T8 之间的短接线,连接上 2 段火温控器 . 试验 : 50Hz 230V – 断开温控器开关,检查燃烧器是否停机 . – 遮黑光电管,检查燃烧器是否锁定 . 主开关 段火计时器 段火 计时器 (230V - 0.1A max.) (230V - 0.1A max.) 段火...
  • Page 18 工作 4.1 燃烧调节 根据效率标准 92/42/EEC, 调试燃烧器必须参考锅炉的使用说明 , 这一工作包括调整烟气中的 CO 和 CO , 烟温 及锅炉中的平均水温。 要达到所需要的出力,应按照下表选择合适的喷嘴,调整泵压,设定燃烧头和风门 . 表中的数值由 CEN 锅炉测得 ( 按照 EN 267). 参考条件:12.5% CO 2 ,在海平面,油温和室温为 20 °C. 泵压 燃烧器输出 燃烧头设置 风门调节 喷嘴 段火 段火 kg/h ± 4% 角度 段火...
  • Page 19 图 . 12 拧松螺钉 (2) 和 螺母 (3) 后取下喷嘴座 (1), 从控制  盒和光电管 (5) 取下连接电缆 (4). 从电极上移去电缆 (4) , 松开螺钉 (3, 图 . 13) 后从  喷嘴座上 (1) 移去 旋流盘 (8) . 正确地拧上喷嘴 (9) 按图所示拧紧 .  注意 如图所示,在重新安装喷嘴座时应拧紧螺母 (3) . D5684 拧紧但不要拧到头...
  • Page 20 4.5 泵压和空气输出 段火调整 风门的调整 : 松开螺母 (1), 转动螺钉 (2) 直到指示器 (3) 到达预期点 . 然后 图 . 14 锁紧螺母 (1), ( 参见图 . 14). 油压调节 : 厂家设定为 9 bar . 如要调整油压 , 可调整螺钉 (7) 来实现 . 压力表必须接在接口 (8), ( 参见图 . 15). 段火调整...
  • Page 21 维护 燃烧器需要由有资格的技术人员进行定期性的维护 维护对于燃烧器的可靠性是必要的 , 可避免燃料的过量消耗以及随之而来的污染 . 在进行维护清理之前 , 必须将系统的主电源开关关掉 , 以切断燃烧器的电源 . 基本的检查有 : 检查进油管及回油管是否有堵塞或凹陷 .  清理进油管及油泵中的过滤器 .  清理光电管 (8, 图 . 1, P. 1).  检查燃料消耗是否正常 .  如需要更换喷嘴 ( 图 . 12,P.7) 和检查电极的位置 ( 图 . 13, P. 7). ...
  • Page 22 故障 / 解决方法 下面是造成启动故障或燃烧器非正常运行等问题的原因及相应的解决方法 . 故障通常会造成位于控制盒 (4, 图 . 1, P. 1) 复位按钮键中的锁定指示灯亮 . 当锁定灯亮时 , 只有按复位按钮燃烧器才会重新启动 , 此后如果燃烧器运行正常 , 锁定可以归因于暂时故障 . 如果继续锁定 , 一定要查找原因 , 并加以解决 . 故障 可能的原因 解决方法 检查 7 针插头中的 L1-N 线之间的电压是 否存在 . 无电源 . 检查保险丝的状况...
  • Page 24 Registered Office - 公司注册所在地 : 生产场所 : Manufacturing site: RIELLO S.p.A. Riello Heating Equipment (Shanghai) CO., LTD Riello Heating Equipment (Shanghai) CO., LTD I-37045 Legnago (VR) No. 388, Jinbai Road - Jinshan Industrial Zone 利雅路热能设备 ( 上海 ) 有限公司 Tel.: +39.0442.630111 201506 - Shanghai 上海市金山工业区金百路...