15-4-2. PAR-SL97A-E
Measure an impedance between the power supply terminal block on
the outdoor unit and ground with a 500 V Megger and check that it is
equal to or greater than 1.0 MΩ.
1. Turn on the main power to the unit.
TEST RUN
2. Press the
button twice continuously.
(Start this operation from the status of remote controller display
turned off.)
TEST RUN
A
and current operation mode are displayed.
MODE
3. Press the
(
check whether cool air blows out from the unit.
MODE
4. Press the
(
check whether warm air blows out from the unit.
FAN
5. Press the
button and check whether strong air blows out
from the unit.
VANE
6. Press the
button and check whether the auto vane operates
properly.
7. Press the ON/OFF button to stop the test run.
Note:
• Point the remote controller towards the indoor unit receiver
while following steps 2 to 7.
• It is not possible to run in FAN, DRY or AUTO mode.
15-4-3. PAR-SL100A-E
1. Press the
button 1 to stop the air conditioner.
• If the weekly timer is enabled (
button 3 to disable it (
button 2 for 5 seconds.
2. Press the
comes on and the unit enters the service mode.
button 2.
3. Press the
B comes on and the unit enters the test run mode.
4. Press the following buttons to start the test run.
: Switch the operation mode between cooling and heating
and start the test run.
: Switch the fan speed and start the test run.
: Switch the airflow direction and start the test run.
: Switch the louver and start the test run.
: Start the test run.
5. Stop the test run.
• Press the
button 1 to stop the test run.
• After 2 hours, the stop signal is transmitted.
OCH771C
) button to activate
mode, then
COOL
) button to activate
mode, then
HEAT
is on), press the
is off).
7
3, 4
2
3
136
TEST RUN
TEMP
ON/OFF
FAN
AUTO STOP
5
AUTO START
MODE
VANE
6
CHECK LOUVER
h
TEST RUN
min
SET
RESET
CLOCK
B
A
1
2