Mitsubishi Electric PUZ-ZM200YKA2-ET Service Manual page 111

Table of Contents

Advertisement

OPERATING PROCEDURE
12. Removing the reactor (DCL) (V model only)
(1) Remove the electrical parts box. (See photo 4)
(2) Remove the cont. box base fixing screws (3 for front/ 4 x
10) to remove the cont box base.
(3) Disconnect the connector, DCL on the power circuit
board.
(4) Release the lead wire from the hole on cont. box base.
(5) Loosen the cable strap for the lead wire.
(6) Remove the screws for reactor (4×10) to remove the
reactor.
13. Removing the reactor (ACL) (Y model only)
(1) Remove the service panel. (See Photo 1)
(2) Loosen the clamp for the lead wire on separator.
(3) Disconnect the lead wires from the reactor (ACL).
(4) Remove the reactor box fixing screws (4 for right side/
4x10) to remove the reactor box.
(5) Remove 4 screws for reactor in the reactor box to
remove the reactor.
Note 1: Pay extra attention when handling the reactor
since it is very heavy (4.1 kg).
Note 2: The reactor can be easily removed by removing
the electrical parts box.
OCH771C
PHOTOS/FIGURES
Photo 19
(100V)
Electrical
parts box
(125V/140V)
Screws
Screws
Screws
Photo 20
Reactor box
fixing screws
111
Screws
Reactor
Screws
Electrical parts box
Reactors
4-way valve
Reactors
Reactor fixing screws

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents