Spring
C
;
Cassette
Frame
AE
4
Head
Base
Unit
Fig. 6
Spring
E
Pinch
roller Unit (B)
FL
Q}.)
Cf, EP Sas
'2
x
aS
Fig. 5
Fig. 7
1.
Remove spring A. (Fig.4)
9.
Move head base unit forward. (Fig.6)
2.
Extend claws (2 points). (Fig.5)
10. Remove spring E. (Fig.7)
3.
Remove bar Spring. (Fig.5)
11. Remove E-ring B. The pinch roller unit (A) can be
4.
Disengage projection by moving in a direction of arrow
removed. (Fig.7)
mark. (Fig.5)
12. Remove E-ring C. The pinch roller unit (B) can be
5.
The cassette frame is removed. (Fig.6)
removed. (Fig.7)
6.
Remove springs C and D. (Fig.6)
13. Remove two screws D. The head can be removed.
7,
Remove E-ring A. (Fig.6)
(Fig.7)
8.
Remove FF/REW levers. (Fig.6)