Tools And Test Equipment - GE Innova IGS 620 Preinstallation Manual

Table of Contents

Advertisement

3.2 Tools and Test Equipment

Refer to
Table
Table
1-2, refer to the appropriate component Pre-Installation Manual listed in
System
Compatibility.
Table 1-2:
PRODUCT OR COM‐
PONENT
Frontal Positioner
Lateral Positioner
Status Display
Omega Table
C2 Cabinet (Frontal and
Lateral)
X-Ray Head
C1 Cabinet
38
1-2. To obtain a list of tools and test equipment for components not specified in
TOOL OR TEST EQUIP‐
MENT
Service Engineer's Tool
Case
Level, Protractor Type
Plumb Line included in
46-216640G1
Torque Wrench 2 to 20
daN.m (15 ft. lbs. to 150
ft. lbs.)
1/2 inch Ratchet Wrench
(2)
Wrench, Spanner
(46-176584P1)
Laptop Computer (MS-
DOS Windows)
Ladders
Lateral Positioner Tool‐
case (shipped with Lat‐
eral Positioner)
5-axis Laser Alignment
tool (shipped with PIM
kit)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Same as for Frontal Positioner (Service Engineer's Tool Case)
Innova
IGS 620, Innova
TM
USED FOR
General Use
Positioner Checks
Positioner Checks
Positioner Checks
Raise and Lower Posi‐
tioner shipping dolly
High Voltage Cable In‐
stallation
Positioner Configura-tion
and Calibration
Installation
Installation
Installation
IGS 630 Preinstallation Manual
TM
Direction 5694389-1-1EN, Revision 2
Chapter 2,
SOURCE
RECEIVED (DATE)
3 Delivery Requirements

Advertisement

Table of Contents
loading

This manual is also suitable for:

Innova gs 630

Table of Contents