Primary Secondary Piping - UTICA BOILERS SFM CONSTELLATION Series Installation, Operation & Maintenance Manual

Modular oil fired cast iron boilers
Table of Contents

Advertisement

Figure 2 - pRimARY SECONDARY pipiNG
An alternate method of connecting the supply and return piping can be seen in figure #2 below.
(Refer to the engineering manual for detailed piping recommendations.)
PRIMARY
PUMP
FRONT OF
BOILER
LOAD
PUMPS
Note: The tapping sizes for the supply and return piping are 2" and 1 ½" respectively.
It is recommended that the main piping be 3" and the branches 1 ½".

PRIMARY SECONDARY PIPING

PRIMARY
LOOP
AIR ELIMINATOR &
EXPANSION
TANK
TO
EXPANSION
TANK & SYSTEM
FILL
12"
MAX
BRANCH
SECONDARY
REAR OF
BOILER
7
PUMP
BRANCH

Advertisement

Table of Contents
loading

Table of Contents