Commissioning - Siemens 7 SK 88 A Series Installation And Maintenance Instructions Manual

Idmtl overcurrent relay
Table of Contents

Advertisement

- 13 -
7.
Commissioning
Firstly,
chec~
that the connect,ions of current transformers, tripp-
ing and alarm connections as well as the polarity of the auxiliary
supply are correct:
1. Check ratio and connections of C.T.s
}
(fig. 3 or 8)
Check auxiliary supply voltage and polarity
2. Check response of relay at your settings:
CAUTION:
When removing or restoring connections, the accepted
safety practices and regulations must be observed. Dur-
__
ing all measurements take care that the thermal capacity
is not exceeded (see fig. 10).
a) Remove transparent front cover. The external C.T. is automati-
cally short-circuited and disconnected from relay.
b) Using test plug with the associated cable 7XV81 (which includes
the trip circuit output - see figure
9)
check the operating
time at one or two points on the characteristic, one with a
test current of approximately four times plug setting and one
at a higher value if possible (Siemens test sets 7VP44 or
1VP461
may be used for this purpose). The permissible toler-
ance should not 'exceed
~
20
%
(according to BS 142) •
Should larger tolerances exist then, as a first step, the test
set-up should be checked:
superimposed load current
shunt circuit for test current
}
not possible if
1XV81
is used for testing
test current not constant during relay delay time
test current not injected (in particular for C.T.-powered
relays).
If after checking the above points an excessive tolerance exists
then the complete relay should be returned for repair. Do not
attempt recalibration.

Advertisement

Table of Contents
loading

Table of Contents