Toro Titan ZX4875 Operator's Manual page 44

Hide thumbs Also See for Titan ZX4875:
Table of Contents

Advertisement

Hauling the Machine (continued)
4. Back the machine up the ramp.
5. Shut off the engine, remove the key, and move
the motion-control levers outward to the P
position.
6. Tie down the machine using straps, chains,
cable, or ropes. Refer to local regulations for
tie-down requirements.
Unloading the Machine
1. Lower the ramp, ensuring that the angle
between the ramp and the ground does not
exceed 15 degrees.
2. Drive the machine forward down the ramp.
Operation: After Operation
ARK
G414592
G451313
G414593
Page 4–27
3464-637 A

Advertisement

Table of Contents
loading

Table of Contents