Operation
The operation of the 1093 metering valve is controlled
by an external source. If a Control Box was purchased,
see the Control Box manual for operation instructions.
See Related Manuals on page 2.
Sequence of Operation
Step 1: Reload
•
Spool shifts to the right
•
Material feed inlet is opened
•
Material is transferred into the metering chambers
by a pressurized feed system
•
Outlet port is blocked
•
Metering rod is retracted to a precise position
determining the volume of each material
313566D
Step 2: Shift
•
The balanced spool shifts to the dispense position
•
Material path to the needle is opened
•
Material feed inlet port is blocked
•
Metering rod remains in the retracted position
Step 3: Dispense
•
Metering rod extends
•
Material is dispensed from the metering chamber
into the needle
Upon completion of the dispense stroke, the metering
rod and spool shifts back to the reload position.
Operation
15