Operation

The operation of the 1093 metering valve is controlled
by an external source. If a Control Box was purchased,
see the Control Box manual for operation instructions.
See Related Manuals on page 2.

Sequence of Operation

Step 1: Reload
Spool shifts to the right
Material feed inlet is opened
Material is transferred into the metering chambers
by a pressurized feed system
Outlet port is blocked
Metering rod is retracted to a precise position
determining the volume of each material
313566D
Step 2: Shift
The balanced spool shifts to the dispense position
Material path to the needle is opened
Material feed inlet port is blocked
Metering rod remains in the retracted position
Step 3: Dispense
Metering rod extends
Material is dispensed from the metering chamber
into the needle
Upon completion of the dispense stroke, the metering
rod and spool shifts back to the reload position.
Operation
15